Teraplex Alpha

Power, cooling and rack infrastructure for phased AI deployments.

Alpha brings the facility systems together around the selected compute platform. GPU servers, networking equipment and software are scoped separately. Final equipment supply and responsibilities are agreed for each project.

What the system includes

Power infrastructure

Medium and low voltage interface, transformers, UPS, A/B distribution, batteries, and generator interfaces.

Rack infrastructure

24 rack positions, high density busway, rack liquid interfaces, residual air cooling, and technical access.

Cooling and controls

Pumps, filtration, controls, air side cooling, fire protection, and building management and monitoring interfaces.

External heat rejection is selected for the site climate. The enclosure arrangement shown on the product page is a concept, not a construction drawing.

The GB300 reference

16 compute rack positions and 8 network and support positions. The modeled electrical peak is 2.536 MW; sustained operating load is confirmed during project engineering.

Compute

GB300 NVL72 rack positions16
Network and support rack positions8
GPUs, reference configuration1,152
Grace CPUs, reference configuration576
Modeled rack power, GB300 EDPp≈155 kW

Power

Modeled electrical peak, IT2.536 MW
Reference gross facility interface≈3.0 MW
Busway provisioning per GB300 rack192 kW
Distribution basisIndependent A/B paths; optional 2N UPS
UPS autonomy, budgetary basis15 minutes

Cooling

Direct liquid cooling design capacity2.100 MW
Air side design capacity0.280 MW
Total thermal design basis2.380 MW
Heat rejection duty capacity2.500 MW
Facility water supply and return41/51 °C

Water and footprint

Normal operating modeDry, no water
Adiabatic transition reference≈39 °C ambient
Utility water connectionNot required
On site storage equivalent100 m³
IT module envelope16.2 m × 6.8 m

Electrical peak, thermal design and heat rejection duty describe different reference conditions. They must be reconciled for the intended operating load. These figures do not establish a certified or guaranteed deployment rating.

What the site needs

Allow additional space for transport, lifting, maintenance, external equipment and future phases. Available power, climate, local approvals and the selected rack platform determine the final layout.

From factory to first load

  1. Define the deployment. Agree the load, supply scope, site interfaces and acceptance criteria.
  2. Work in parallel. Coordinate factory fabrication and integration with site preparation and power readiness.
  3. Test before shipment. Factory acceptance testing checks the agreed integrated systems.
  4. Connect and commission. Site acceptance testing verifies the installed configuration before the agreed load is brought online.

Equipment availability, utility readiness and the commissioning scope determine the schedule.