Sites & power

Power for your
first deployment.

A plan for what comes next.

Bring site requirements, power availability and connection timing into one deployment plan.

Substation equipment and electrical connections.

Start with the site.
Plan around the load.

Qualify the site.

Bring power availability, connection timing, access and site constraints into view before setting the deployment plan.

  • Available and planned power
  • Utility connection timing
  • Access and site requirements

Plan the first phase.

Match the initial compute load with the electrical infrastructure, redundancy and site work needed for installation.

  • Initial load and configuration
  • Distribution and redundancy
  • Installation and commissioning

Prepare for expansion.

Account for future capacity in the power and site plan, with space and connections considered alongside the next phase.

  • Phased capacity requirements
  • Space for the next deployment
  • Power and connection planning

Sites. Power. Compute.

A standard platform.
A coordinated site plan.

Alpha brings power, cooling and rack infrastructure together before delivery. The site plan addresses the foundations, power connection and access needed to deploy that platform.

Plan the first load and the capacity to follow as one development sequence.

Explore Alpha
Supporting infrastructureInfrastructure in scope.

Equipment follows the deployment requirements. Final ratings, interfaces and supplier responsibilities are confirmed in project documents during engineering.

Switchboards.

Coordinate amperage, feeder architecture, redundancy, and metering requirements for the project.

Switchgear.

Plan utility or campus distribution, protection, and service requirements before equipment selection.

Modular substations.

Coordinate transformation, switching, distribution, and site interface requirements in one project scope.

Generator sets.

Define backup or prime power duty, runtime, fuel type, controls, and redundancy.

Power monitoring and controls.

Define metering, EPMS or SCADA integration, alarms, and interfaces between equipment packages.

Planning the schedule?
Explore equipment lead times.

Let’s plan your
first deployment.

Share your site location, target load and timing. We’ll work through power availability, site requirements and the first phase with you.

Discuss your site and power