Capacity digest / Issue 03

Observed 28 July 2026

Public GPU capacity listings

Fourteen dated public GPU listings from six providers, shown with pricing, scale, provider-stated status and missing infrastructure fields preserved.

Providers
6

Public listings
14

Published rates
$2.41–$8.62 · €1.65

Per GPU-hour

Observation date
28 July 2026
Source pages
25 re-read for this issue
Reading time
3 min · no sign-up

Every row below is a dated read of public provider pages. The pages can change after re-read, so the source log preserves the observation boundary.

Offers

Provider Public configurations Capacity per listing Status boundary Published price Commercial basis Source
Impossible Cloud H100 SXM; GB300; two B300 configurations 8–1,152 GPUs Two dated listings; two not displayed $2.41–$4.42/GPU-hour 12–60 months Impossible Cloud
Prime Intellect B300 SXM6 reserved example 512 GPUs Not displayed $5.00/GPU-hour 3 years Prime Intellect
Verda Four Instant Cluster configurations; one H200 VM; one B200 VM 1–144 GPUs Provider-stated self-service; current stock not verified $4.00–$8.62/GPU-hour PAYG; VM use billed in prepaid 10-minute increments; VAT applies Instant Clusters, H200 VM, B200 VM
Gcore One H100 80 GB virtual GPU machine 1 GPU Provider-stated self-service. Sines-3 is the named launch region. Current stock is unverified. €1.65/VM-hour Minimum term not published; prices exclude VAT Gcore
Google Cloud One a3-highgpu-8g Flex-start VM 8 GPUs Listed in us-central1-c. The zone is supported. Current stock is unverified. USD 38.32/VM-hour PAYG; runtime up to 7 days; reservations unsupported Google Cloud
Crusoe One h100-80gb-sxm-ib.8x VM 8 GPUs Provider-stated self-service; current stock not verified $3.90/GPU-hour On demand; no minimum commitment Crusoe

The dashboard preserves each configuration inside its provider row. The five added records appear only in the currently listed bucket. Provider-stated self-service paths, supported zones, published prices and documented create workflows do not establish current stock, launchability, reservability or successful provisioning.

These records differ in hardware generation, cluster size, region disclosure, availability, term and source type. They do not establish a market average or directly comparable quotes. Every derived normalization is labeled in the dashboard. No authenticated inventory query, reservation, provisioning request or billable launch was performed.

Direct source log

Electrical disclosure boundary

The provider pages do not display the utility, service voltage, committed megawatts, study status or grid-energization date for these records. Compute-fabric terms such as InfiniBand or bandwidth per node do not establish electrical interconnection.

FERC’s 18 June 2026 action addresses the rules governing how data centers and other large energy users connect to the grid. FERC large-load integration release.

Boundary

This is dated public-data curation. It is not an offer, availability confirmation, valuation, pricing recommendation, demand forecast or matching service. Availability, configuration, taxes, region and commercial terms require confirmation before procurement or scheduling.

Source ledger

Open the pages behind this issue.

Each source shows when it was last read. Public pages may change after capture.

  1. 01 Impossible Cloud bare-metal listings Read 2026-07-27
  2. 02 Prime Intellect compute page Read 2026-07-27
  3. 03 Verda Instant Clusters Read 2026-07-28
  4. 04 Verda H200 product page Read 2026-07-29
  5. 05 Verda B200 product page Read 2026-07-29
  6. 06 Verda CLI instance reference Read 2026-07-29
  7. 07 Verda GPU instances catalog Read 2026-07-29
  8. 08 Verda pricing and billing Read 2026-07-29
  9. 09 Verda terms Read 2026-07-29
  10. 10 Verda locations Read 2026-07-29
  11. 11 Gcore AI pricing Read 2026-07-29
  12. 12 Gcore GPU VM launch notice Read 2026-07-29
  13. 13 Gcore virtual GPU flavors API reference Read 2026-07-29
  14. 14 Google Cloud Flex-start pricing Read 2026-07-29
  15. 15 Google Cloud A3 machine specifications Read 2026-07-29
  16. 16 Google Cloud GPU regions and zones Read 2026-07-29
  17. 17 Google Cloud Flex-start overview Read 2026-07-29
  18. 18 Google Cloud Flex-start creation guide Read 2026-07-29
  19. 19 Crusoe Cloud pricing Read 2026-07-29
  20. 20 Crusoe VM quickstart Read 2026-07-29
  21. 21 Crusoe InfiniBand reference Read 2026-07-29
  22. 22 Crusoe VM specifications Read 2026-07-29
  23. 23 Crusoe billing documentation Read 2026-07-29
  24. 24 Crusoe legal terms Read 2026-07-29
  25. 25 FERC large-load integration action, 18 June 2026 Read 2026-07-27