Power Infrastructure

Switchgear, transformers,
gensets, SCADA. 24 to 34 weeks.

While Schneider, Eaton, ABB, and Siemens are quoting 50 to 100+ weeks for the same equipment classes.

Get a lead-time quote in 1 business day → Talk to engineering

The wedge

Same equipment classes. Half the wait, or better.

Our power-infra scopes use the same Tier-1 components US developers already buy direct. The difference is integration and the production line. We assemble, factory-test, and ship as one delivery — not five components on five purchase orders waiting on five lead times.

Equipment class Industry quoted Teraplex quoted
LV switchgear (≤6300A) 26–52 wk 12–18 wk
MV switchgear (6–35 kV) 52–78 wk 14–18 wk
Modular substations + dry-type transformers 60–100+ wk 16–22 wk
Containerized gensets (≤3 MW) + ATS 20–50 wk 16–24 wk
SCADA & integration 20–30 wk 12–16 wk

Industry lead times sourced from publicly available OEM literature and trade-press as of Q2 2026; subject to refresh in our quarterly Lead-Time Tracker.

See the full lead-time tracker →

In the catalog

Five equipment classes. One PO when bundled.

Sold standalone or as an integrated power package. Per-class spec sheets are coming online through Q2 2026.

LV switchgear

Power and motor control centers up to 6300A.

Type-tested assemblies per IEC 61439, with a UL 891 listing path for US installations. Standard breaker, contactor, protection, and power-monitoring functions. Sized at 2000A, 4000A, and 6300A typical for data center, IPP, and behind-the-meter applications.

Spec sheet →

MV switchgear

Air-insulated and gas-insulated, 6 to 35 kV.

IEC 62271 with an IEEE C37 dual-cert path for US grid interconnection. 6 kV, 10 kV, 15 kV, 20 kV, and 35 kV classes. Relay-protection panels and grid-connection scope included as part of the substation package, not a separate procurement.

Spec sheet →

Modular substations

Containerized 6/0.4 kV and 10/0.4 kV substations.

Cast-resin dry-type transformers, 1–5 MVA typical for data center applications. Containerized for field deployment — substation, transformer, MV switch, and LV feed shipped as one factory-tested package. Other transformer ratios on request.

Spec sheet →

Generator sets

Containerized gensets up to 3 MW, ATS, paralleling.

Tier-1 OEM diesel gensets from 15 kVA to 3 MW with automatic transfer switches and paralleling controls for multi-genset configurations. Containerized for outdoor deployment. Diesel standard; bi-fuel and gas configurations available. Genset, ATS, and switchgear are integration-tested together before shipping.

Spec sheet →

SCADA & integration

One monitoring platform, grid to rack.

SCADA spanning power distribution, process control, and real-time metering. Modbus, SNMP, BACnet, and REST API for any DCIM or BMS integration. Industrial-grade controls panels sized to the substation, genset, and switchgear scope on the project.

Spec sheet →

Lead-time tracker

Our quarterly published index of US power-equipment delivery times, by class.

Distribution transformers, MV switchgear, dry-type, gensets, ATS, UPS — what the wider market is quoting versus what we're quoting, refreshed every quarter. The data we use to triage your project schedule is the same data we publish.

Read the Q2 2026 tracker →

Subscribe

Get the tracker in your inbox each quarter.

Enter your work email to receive US Power Equipment Lead-Time Tracker. Delivered within 60 seconds.

Privacy policy. No spam.

Get a quote in 1 business day.

Tell us your one-line, your need-by date, and your TAA or federal requirements. We come back within one US business day.

Get a lead-time quote → Talk to engineering