Power Infrastructure

4000A and 6300A LV switchboards.
16-week delivery window.

Plus MV switchgear, modular substations, gensets, and SCADA on the same schedule. Same Tier-1 OEM components US developers already use, assembled and factory-tested as one delivery instead of five separate POs waiting on five lead times.

Get a lead-time quote → Talk to engineering

The wedge

Same equipment classes. Half the wait, or better.

Our power-infra scopes use the same Tier-1 components US developers already buy direct. The difference is integration and the production line. We assemble, factory-test, and ship as one delivery instead of five components on five purchase orders waiting on five lead times.

Equipment class July public reference Teraplex quoted
4000A LV switchboard 18–34 wk 16 wk
6300A LV switchboard Project quote 16 wk
MV switchgear (6–35 kV) 15–40+ wk 14–18 wk
Modular substations + dry-type transformers Project quote 16–22 wk
Containerized gensets (≤3 MW) + ATS ATS 4–30 wk; genset quote 16–24 wk
SCADA & integration 32–50 wk listed controls 12–16 wk

Public reference points checked July 17, 2026 against Schneider Electric's July 2026 Lead Time Guide. Exact lead times are configuration-specific and must be confirmed in a current quotation. See the Lead-Time Tracker for sources.

See the full lead-time tracker →

In the catalog

Six equipment classes. One PO when bundled.

Sold standalone or as an integrated power package. Per-class spec sheets publish as each configuration is validated.

Switchboard sizing per AI deployment

A typical 60 MW AI data center needs 15–24 LV main switchboards depending on N/2N topology and rack-density mix. Exact equipment scope depends on redundancy, feeder architecture, and commissioning requirements. Public OEM timing varies by configuration; obtain a current quote for an exact comparison.

4000A LV switchboard

2.7 MW per board. Standard modular DC fit.

LV main switchboard at 4000A continuous, 480V three-phase. Fits the standard modular DC container at 60–80 kW/rack density. Type-tested per IEC 61439 TTA; UL 891 dual-cert path via NRTL listing for US installations. Breaker, contactor, protection, and power-monitoring functions integrated. Teraplex delivery window: 16 weeks; the July 2026 public OEM reference for listed LV switchboards spans 18–34 weeks.

Spec sheet →

6300A LV switchboard · flagship

4.2 MW per board. NVL72 / GB200 / GB300 fit.

LV main switchboard at 6300A continuous, 480V three-phase, type-tested per IEC 61439 TTA with a UL 891 dual-cert path via NRTL listing. The natural single-unit fit for NVL72-class deployments at 120+ kW/rack. Public OEM timing at this amperage is configuration-specific; the Teraplex quoted delivery window is 16 weeks.

Spec sheet →

MV switchgear

Air-insulated and gas-insulated, 6 to 35 kV.

IEC 62271 with an IEEE C37 dual-cert path for US grid interconnection. 6 kV, 10 kV, 15 kV, 20 kV, and 35 kV classes. Relay-protection panels and grid-connection scope included as part of the substation package, not a separate procurement.

Spec sheet →

Modular substations

Containerized 6/0.4 kV and 10/0.4 kV substations.

Cast-resin dry-type transformers, 1–5 MVA typical for data center applications. Containerized for field deployment: substation, transformer, MV switch, and LV feed shipped as one factory-tested package. Other transformer ratios on request.

Spec sheet →

Generator sets

Containerized gensets up to 3 MW, ATS, paralleling.

Tier-1 OEM diesel gensets from 15 kVA to 3 MW with automatic transfer switches and paralleling controls for multi-genset configurations. Containerized for outdoor deployment. Diesel standard; bi-fuel and gas configurations available. Genset, ATS, and switchgear are integration-tested together before shipping.

Spec sheet →

SCADA & integration

One monitoring platform, grid to rack.

SCADA spanning power distribution, process control, and real-time metering. Modbus, SNMP, BACnet, and REST API for any DCIM or BMS integration. Industrial-grade controls panels sized to the substation, genset, and switchgear scope on the project.

Spec sheet →

Lead-time tracker

Our quarterly published index of US power-equipment delivery times, by class.

Distribution transformers, MV switchgear, dry-type, gensets, ATS, UPS: what the wider market is quoting versus what we're quoting, refreshed every quarter. The data we use to triage your project schedule is the same data we publish.

Read the July 2026 tracker →

Subscribe

Get the tracker in your inbox each quarter.

Enter your work email to receive US Power Equipment Lead-Time Tracker. Delivered within 60 seconds.

Privacy policy.

Get a quote.

Tell us your one-line, your need-by date, and your TAA or federal requirements. We come back within one to two US business days.

Get a lead-time quote → Talk to engineering