Resources Engineering Council
Engineering Council.
Quarterly long-form research and writing from our engineering and BD teams.
The 24-piece editorial calendar runs at two pieces per week through our 12-week launch window, then settles to one piece per week with quarterly tracker issues, bi-monthly video, and reactive press placements. Cluster-anchored, single-CTA, no thought-leadership filler. The piece titles below are the launch-week openers.
Launch: Week 1 and 2
Publishing alongside Site v1.
No posts yet. The four pieces below are the Week 1 and Week 2 openers from our editorial calendar; they publish here when Site v1 ships. Subscribe below to get them in your inbox the day they post.
- Week 1 Coming soon
Why US Power Transformer Lead Times Doubled in 24 Months, and What's Next
Lane B · Long-form
Cluster · Distribution-transformer shortage
- Week 1 Coming soon
Section 889 in 2026: A Plain-English Guide for Modular DC Buyers
Lane A+B · Long-form + glossary
Cluster · Section 889 compliant DC
- Week 2 Coming soon
Calculator Launch: GPU Density TCO at +43°C Ambient
Lane A · Calculator-launch
Cluster · GPU rack power-density calculator
- Week 2 Coming soon
MV Switchgear Lead Times by Voltage Class: 2026 Q2 Update
Lane B · Tracker companion
Cluster · Medium-voltage switchgear lead time
Subscribe
Engineering Council updates in your inbox.
One email per published piece. No newsletter blasts. No "ten things you need to know." Long-form, decisive, single-CTA writing, including the quarterly lead-time tracker companion notes.
Unsubscribe in one click. Privacy policy at /legal/privacy.
Subscribe
Get each piece the day it ships.
A direct question is faster than a future post.
If you're sitting on a lead-time problem or a federal-pathway question right now, put the question to engineering. First response within one to two business days.